At 11:00 (Wednesday), 4th (Wednesday), the average snow depth at the designated observatory reached the application criteria for the disaster rescue ordinance, and the ordinance was applied, so it was a response based on the Disaster Countermeasures Basic Law.The Heavy Snow Disaster Countermeasures Headquarters, whose mayor is the head of the mayor, has been set up.
10 days from February 23 (Wednesday) to March 4 (Friday) * Ended
Subsidies of the cost of snow down the roof provided by households requiring support
From Thursday, February 24th, March 4th (Friday) * Ended
From 9:00 am to 4:30 pm during the above period
十日町地域 | 「十日町橋」右岸側堤防沿い(高田町6丁目地先) |
---|---|
川西地域 | 「妻有大橋」左岸側下流(上新井地先) |
中里地域 | 「宮中橋」左岸側上流(宮中地先) |
松代地域 | 「青葉住宅団地」奥(青葉地先) |
松之山地域 | 「松之山なめこ工場」向かい(松之山新山地先) |
From November 1st, 3rd to March 31st, 4th, 4th, 4th
区域 | 軽減後 | 通常時 |
---|---|---|
山間地 | 5% | 10% |
山間地以外 | 20% | 30% |
区分・被害程度 | 被害数 | 前回更新時からの増加数 | ||
---|---|---|---|---|
人的被害 | 死者 | 3人 | ||
重傷者 | 9人 | |||
軽傷者 | 15人 | 1人 | ||
計 | 27人 | 1人 | ||
建物被害 | 住家 | 全壊 | - | |
半壊 | 1棟 | |||
一部損壊 | 1棟 | |||
床上浸水 | - | |||
床下浸水 | - | |||
計 | 2棟 | |||
非住家 | 全壊 | 2棟 | 1棟 | |
半壊 | 2棟 | 1棟 | ||
一部損壊 | - | |||
床上浸水 | - | |||
床下浸水 | 1棟 | |||
計 | 5棟 |
[Niigata Prefecture Homepage] About the damage status due to snow in the 3rd year
In the city, in order to prevent citizens' lives from being significantly hindered due to snow damage, we will collaborate with the national and prefectural snow removal measures organizations, secure traffic on major roads and logistics, and other necessary snow damage prevention measures.We are proceeding.
Ordwa 3rd year Snow damage prevention plan implementation guidelines (PDF file: 653.2KB)
Ordinth 3rd year Snow damage prevention plan implementation Table / separate diagram (Table 13 -Another Table 15) (PDF File: 3.2MB)
Depending on the status of snowfall in the future, it is expected that the number of people in the snow removal work will increase, and there is concern that an accident will occur.Be careful when removing snow.
Be sure to perform snow removal work with multiple people, and make sure to check the safety confirmation before work (such as fixed ladder fixed confirmation).
The Ministry of Land, Infrastructure, Transport and Tourism is engaged in various efforts, such as safety measures for snow removal work.For details, please check the Ministry of Land, Infrastructure, Transport and Tourism website (lower link).
Local promotion: Material download page (Ministry of Land, Infrastructure, Transport and Tourism site)
Please be careful about accidents during snow removal work (site in Niigata Prefecture)
Please see the linked page below for the snowfall information in the prefecture and in the prefecture.
Niigata Prefectural Road Information System Top Page
Amedas (Japan Meteorological Agency site)
On the "Niigata Hometown Information Bureau" site, you can see live camera images from all over the prefecture.
Niigata Live Camera Top Page
The materials will be attached below for the "Dangerous Point Maps" and "A Validation Foundation of Aeval", so please use them to check the dangerous places.If you do not approach the dangerous place and check the precarious phenomena, please contact the city hall in charge of the city hall (construction section, disaster prevention safety section) or Niigata prefecture (Tokamachi Regional Promotion Bureau Regional Development Department).To do.
Dangerous place Map Tokamachi City (PDF File: 2.0MB)
About the precursor phenomenon (PDF file: 579.4KB)
Please contact Niigata Prefectural Civil Engineering Division Sabo Division Planning and Coordinator (Tel and Number: 025-280-5424) for "Dangerous Dangerous Point Map".In addition, the Dangerous Point Map (Niigata Prefecture homepage) has released a dangerous place by municipalities in the prefecture.
Dangerous place map (Niigata Prefecture site)
Tohoku Electric Power Network Co., Ltd. Call Center: Phone number 0120-175-366 (toll-free)
Tokamachi Regional Promotion Bureau Regional Development Department: Phone number 025-757-5203 (Maintenance Division)
Tokamachi City Construction Department Construction Division: Phone number 025-761-7412 (Katsuyuki Water Section)
Tokamachi Building Association: 025-752-3803